Scale of delivery
Built Across Borders
Every figure below comes from the delivered record, covering real airports and capacities from a 1999 refuelling revamp to depots commissioned in 2022.
- 38
- Delivered Projects
- 6
- Countries
- 25+
- Years' EPC Delivery
- 13,300 m
- Longest Hydrant Run
The atlas
The Photographed Record
Every project below is shown as built through real site photography grouped by sector. Filter to a sector with the bar below, then follow any project through to its full record.
Sector 01: Aviation
Aviation fuel infrastructure
14 projects · Egypt · Eq. Guinea · KSA · Nigeria
The home network in Egypt10
01Al-Alamein Fuel Depot
Al-Alamein · 2023–2025
02Assuit Fuel Depot
Assuit · 2022
03Cairo Airport
Terminal 2 Hydrant SystemCairo · 2016
04Hurghada Airport
New Fuelling HydrantHurghada · 2014–2018
05Sharm El-Sheikh
Main Jet Fuel Station UpgradeSharm El-Sheikh · 2010
06Borg El-Arab Airport
New Hydrant SystemBorg El-Arab · 2009
07Taba Airport
Main Fuelling DepotTaba · 2009
08Cairo Airport
Terminal 3 Hydrant SystemCairo · 2008
09Hurghada Airport
New Fuelling HydrantHurghada · 2001
10Sharm El-Sheikh
Refuelling System RevampSharm El-Sheikh · 1999
Sector 02: MEP
General MEP works
4 projects · Egypt
Sector 03: Solar
Solar energy
1 project · Egypt
Sector 04: General Building
General building
5 projects · Egypt