Staging
Al Majd · Warner Lewis
We Flow Over Ages
Hydrant pipeline installation at Cairo Airport Terminal 3

Project · Aviation

Cairo Airport – Terminal 3 Hydrant System

The longest run in the portfolio — a 14″ hydrant network of 15,800 m with pumping, metering, cathodic protection and reception/loading stations, delivered in joint venture with Egypt Gas.

Location
Cairo International Airport · JV with Egypt Gas
Type
Hydrant system
Delivered
2008
Location
Cairo International Airport · JV with Egypt Gas
Sector
Aviation
Type
Hydrant system
Delivered
2008
Region
Egypt
Defining spec
15,800 m hydrant

Scope of work

What We Delivered

  • 01Hydrant 14″ · 15,800 m
  • 02JET-A pumping stations
  • 03Flow metering systems
  • 04Reception & loading stations
  • 05Cathodic protection
  • 06Civil works

Gallery

On Site

Hover or tap a frame to open it.

Your Project, Delivered to Spec.